Ecological dike foreshore upgrading – Eastern Scheldt

Construction

Van Oord was the contractor responsible for the execution of the project. The design was made digitally visible for the crane operator on the dredger, which enabled him to accurately place the armour stones bucket by bucket, despite the prevailing currents. After placement of the material, a bathymetric survey demonstrated that elements had successfully been brought into position.